Consultancy Services for establishing 200-500MW Solar Power Plant at Swarnodip

Consultancy Services for Establishing 200-500MW PV Solar Power Plant in Joint Venture (JV) with Bangladesh Army (BA).

 

Client Bangladesh Army (BA)
Status Completed, December, 2020
Location Swarnodwip, Noakhali, Bangladesh
Total Area of the Project 1000 acres
Project Excecution Period 18 months
Name of Owner of the Project Army Welfare Trust (AWT) and Hanergy Holding Group Ltd (HHGL)
Consultancy Cost USD 50,000
Description of provided services :
Sponsor Selection;
Proposal Preparation ;
Brief description of the selected site;
Technology options and best suitable technology considering the site location and grid system;
Civil construction requirement;
To investigate if the site is suitable for making the Solar Power Plant on a Steel Structure or alternative;
To determine Procedure and Scope to fill up the Land by dredging sand or other means if needed;
Major equipment required for installation of the solar PV system.;
Analysis of the solar radiation data of the location;
Yield calculation using PV simulation software (It includes month wise energy generation,
Loss diagram over the whole year, Specific energy yield, Month wise performance ratio etc);
Description of impact analysis and requirement of power evacuation system & cost.
Analysis for High Voltage line from plant site to PGCB Grid Substation;
Description of impact analysis of solar power plant project;
Detailed technical specification of each equipment of power plant (from PV panel up to transmission line);
Detailed technical specifications of the mandatory spare parts;
Preparation of Bill of Quantity (BOQ) with Cost estimation;
Preparing Financial Model for the proposed project;
Estimated cost of the project;
Calculation of levelized tariff considering Solar PV power Plant Project and Fisheries Project with mushroom cultivation or similar;
Preparation of operating budget;
Preparation of Tender document;
Preparation of Standard Power Purchase Agreement;
Risk and Risk mitigation plan for the project;
Complete Plant Layout including all equipment dimensions;
Complete single line diagram of power plant including all protection and metering system;
Detail description of single line diagram;
Solar PV panel mounting structure design.
pemecf

Address

Momtaz Plaza (5th Floor)
House # 07, Road# 04
Dhanmondi, Dhaka-1205

Important Links


  • Power Division
  • NWPGCL
  • EGCB
  • DESCO
  • DOE
  • Power Cell
  • RPCL
  • BERC
  • REB
  • CPGCBL
  • BPDB
  • Petrobangla
  • PGCB
  • DPDC
© Copyright 2016 — PEMEC BD. All Rights Reserved. Design by PEMEC IT