Consultancy Services for Construction of Ghorashal 365MW CCPP Project, BPDB

GHORASAL 365MW GAS BASED COMBINED CYCLE POWER PLANT PROJECT.
Location of the project is at Ghorasal, Narsingdi, Bangladesh. Construction of Combined  Cycle  Power  Plant  of  capacity 365  MW at  site  conditions  (35◦C, 1.013 mbar, 98% R.H.) . Natural Gas will be used as fuel for this Power Plant. The  Combined  Cycle  unit  is of single-shaft  arrangement  with  Synchronous  Self Shifting (SSS) clutch (to allow continuous and reliable simple cycle operation)  arrangement having 1:1:1 (One GT + One HRSG + One ST) configuration. Generator  step-up  transformer(s)  would  be  connected with the 230 kV Ghorasal Grid Sub-Station (by extension of 230 kV bay; 1 and  ½ Breaker system)  through  overhead  conductor  and  other  necessary  electrical  equipment.  

Client Bangladesh Power Development Board (BPDB)
Status Completed
Location Palash, Narsingdi, Ghorasal
Start Date January, 2014
Name of Owner’s Engineer (OE) JV of  O&M Solutions(Maritius),
O&M Solutions Bangladesh Ltd and PEMEC, Bangladesh
Completion Date December, 2014
Name of the EPC Contractor China National Technical Import & Export Corporation(CNTIC) & China National Machinary Import & Export Corporation(CMC)(CNTIC-CMC Consortium).
Contract Value US$ 1,302,354.40
Technical Data  
  • Net Capacity:
Symple Cycle (GT) : 254.286MW
Combined Cycle : 362.942MW
  • Main Equipment
Gas & Steam,Turbine, Generator, Transformer ,HRSG, Cooling Tower etc.
  • Efficiency
53.37%
  • Fuel
Natural Gas
Description of provided services :

-Checking and Approval of Design Calculations, Drawings and Specifications submitted by the Turkey Contractor in respect of all Electrical, Mechanical, Instrumentation Control, Water storage treatment equipment, Civil works and Ancillaries under the scope Of Turnkey Contract.

-Supervision of Erection Work of all Electrical, Mechanical, I&C and Civil works.

-Evaluation, Review and Approval of the field test methods submitted by the Turkey Contractor for Electrical, Mechanical, I&C, Water storage, Treatement Plants and their Auxiliaries, Witnessing of the test at various phases of work.

-Examine and approve the method for testing, pre-commissioning, commissioning procedures (submitted by the Turnkey Contractor).

-Assisting BPDB in Providing the Contractor with Provisional Acceptance Certificate and Final Acceptance Certificate.

-Checking and approval of all Electrical, Mechanical, Civil and I&C "As Built" Drawings Submitted by the Turnkey Contractor.

-Checking various (Technical, Progress and Test reports etc.) and similer documents to beprepared and submitted by the Turnkey Contractor during execution of the Erection work and keeping BPDB informed of the actual Progress of the Work.

pemecf

Address

Momtaz Plaza (5th Floor)
House # 07, Road# 04
Dhanmondi, Dhaka-1205

Important Links


  • Power Division
  • NWPGCL
  • EGCB
  • DESCO
  • DOE
  • Power Cell
  • RPCL
  • BERC
  • REB
  • CPGCBL
  • BPDB
  • Petrobangla
  • PGCB
  • DPDC
 
© Copyright 2016 — PEMEC BD. All Rights Reserved. Design by PEMEC IT