GHORASAL 365MW GAS BASED COMBINED CYCLE POWER PLANT PROJECT.
Location of the project is at Ghorasal, Narsingdi, Bangladesh. Construction of Combined Cycle Power Plant of capacity 365 MW at site conditions (35◦C, 1.013 mbar, 98% R.H.) . Natural Gas will be used as fuel for this Power Plant. The Combined Cycle unit is of single-shaft arrangement with Synchronous Self Shifting (SSS) clutch (to allow continuous and reliable simple cycle operation) arrangement having 1:1:1 (One GT + One HRSG + One ST) configuration. Generator step-up transformer(s) would be connected with the 230 kV Ghorasal Grid Sub-Station (by extension of 230 kV bay; 1 and ½ Breaker system) through overhead conductor and other necessary electrical equipment.
Client | Bangladesh Power Development Board (BPDB) |
Status | Completed |
Location | Palash, Narsingdi, Ghorasal |
Start Date | January, 2014 |
Name of Owner’s Engineer (OE) | JV of O&M Solutions(Maritius), O&M Solutions Bangladesh Ltd and PEMEC, Bangladesh |
Completion Date | December, 2014 |
Name of the EPC Contractor | China National Technical Import & Export Corporation(CNTIC) & China National Machinary Import & Export Corporation(CMC)(CNTIC-CMC Consortium). |
Contract Value | US$ 1,302,354.40 |
Technical Data | |
|
Symple Cycle (GT) : 254.286MW Combined Cycle : 362.942MW |
|
Gas & Steam,Turbine, Generator, Transformer ,HRSG, Cooling Tower etc. |
|
53.37% |
|
Natural Gas |
Description of provided services : | |
-Checking and Approval of Design Calculations, Drawings and Specifications submitted by the Turkey Contractor in respect of all Electrical, Mechanical, Instrumentation Control, Water storage treatment equipment, Civil works and Ancillaries under the scope Of Turnkey Contract. -Supervision of Erection Work of all Electrical, Mechanical, I&C and Civil works. -Evaluation, Review and Approval of the field test methods submitted by the Turkey Contractor for Electrical, Mechanical, I&C, Water storage, Treatement Plants and their Auxiliaries, Witnessing of the test at various phases of work. -Examine and approve the method for testing, pre-commissioning, commissioning procedures (submitted by the Turnkey Contractor). -Assisting BPDB in Providing the Contractor with Provisional Acceptance Certificate and Final Acceptance Certificate. -Checking and approval of all Electrical, Mechanical, Civil and I&C "As Built" Drawings Submitted by the Turnkey Contractor. -Checking various (Technical, Progress and Test reports etc.) and similer documents to beprepared and submitted by the Turnkey Contractor during execution of the Erection work and keeping BPDB informed of the actual Progress of the Work. |